A solar contract should identify who prepares the design, coordinates permitting, manages installation, and supplies closeout records. Ask Solar Mike handles design, contracting, permitting coordination and project management; installation is performed by licensed, insured crews under our Utah contractor license.
For more context, read how solar permitting and utility review affect a Utah project. Use the questions below to compare the written scope in each proposal.
The contract or attached scope should identify the responsible party for each project step. Check who will:
On an Ask Solar Mike project, design, contracting, permitting coordination, project management, and installation responsibilities follow the documented responsibility structure above.
Ask whether the proposal includes a project-specific design or only a preliminary sales layout. The design review should account for verified site conditions, equipment locations, electrical service, backup scope, required clearances, and component routing.
Every Ask Solar Mike system design is produced and reviewed by a licensed engineering firm. If site verification changes the proposed design, written change-order control provides a documented way to present the change.
For equipment and design context, review the Tesla solar panels for Utah homes page.
Do not assume that a mailing city identifies the electric utility. Utility service in south Utah County varies by address—Payson, Spanish Fork, and Salem run their own city power in parts of town, SESD serves others, and some pockets are served by Rocky Mountain Power. Ask Solar Mike confirms the serving utility as step one.
Ask the contractor to place the following information in the project file:
The purpose is to determine whether the contractor has a defined process for identifying requirements, documenting responses, and presenting material design changes in writing.
Ask the designer to identify the main service rating, proposed backup boundary, and assumptions involving gateways, service equipment, or essential-load panels. Ask Solar Mike designs for 200A and 400A service panels, but the backup architecture for a particular home is confirmed through site verification and engineering.
A proposal should not promise a universal whole-home result without verifying the home's electrical configuration. Request a diagram showing the preliminary backup boundary and ask when the site-specific design becomes final.
If the serving utility has paused or does not offer the expected export path, ask whether the project should be evaluated as a non-export design. Ask Solar Mike can design a zero-export Tesla system in which solar serves the home and Powerwall without sending power back to the grid.
For this design path, engineered plans are submitted through the applicable building and electrical permit process without a net-metering application, while Ask Solar Mike confirms project requirements with the city. This does not mean that a city has pre-approved an individual project. Request the address-specific requirements and written project path for any proposed zero-export system.
Ask the contractor to define minor corrections, material scope changes, and the person authorized to approve added work or equipment.
A useful change-order section should answer four questions:
Ask Solar Mike provides written change-order control as part of the homeowner project record. Read the contract language rather than relying on a verbal description of how unexpected work is handled.
Request a closeout checklist as part of the proposal review. Keep the final design, available permit records, inspection results, equipment information, and utility correspondence with the homeowner project record.
Ask Solar Mike customers receive a commissioning receipt, system registration proof, monitoring handoff, a homeowner ownership record, a named service-escalation path, and written change-order control.
Also ask whom to contact if the monitoring view does not match the approved design or if a project record is missing. Ask Solar Mike supplies a named service-escalation path.
Use the same questions for every proposal so that you compare written scope rather than presentation:
Write each answer beside the corresponding contract section. If an answer matters to the project scope but appears only in conversation, request written clarification.
No proposal can anticipate every question a reviewer might raise. It should identify who responds and how material changes are documented through the change-order process.
Not necessarily. Every Ask Solar Mike system design is produced and reviewed by a licensed engineering firm. Ask which site information remains to be verified and which document will serve as the final plan set.
Yes. Ask Solar Mike supports 200A and 400A main service panels, while the site-specific backup architecture is determined through verification and engineering.
Yes. Separate milestones, responsible parties, and required documents show which review is pending and what the documented project path requires.
Ask Solar Mike handles design, contracting, permitting coordination and project management; installation is performed by licensed, insured crews under Utah DOPL license #14015846-5501.
Mark each unanswered permit, inspection, utility, engineering, and change-order question in the proposal. Then request a written scope that addresses those items. To discuss your home's design requirements and project path with Ask Solar Mike, request a solar design consultation.
Last reviewed:
Reviewed by Mike Morris, Founder, Ask Solar Mike.

Your Gateway to Global Adventures Await Here.
Home
About Us
Services
Testimonials
FAQ's
Blog
Location: 955 S HOMESTEAD DR, WOODLAND HLS UT 84653
Phone: (385) 312-0904
Email: [email protected]